Walk G: 8km; total: 89km
After coffee and breakfast, Greg went to Church while Wendy did a lot of nothing except photo booking. After lunch we had a little rest before Greg got stuck into investigating why water was pooling in one of the atriums. He suspected the drain had become blocked with leaves and plant roots, and was correct. Off to Bunnings for supplies and once home and most of the way through the job realised he needed another joiner. Finished most of it, back to Bunnings tomorrow for the final part.
Dinner was leftovers from last night's BBQ, very nice!
Greg fixing the drain
Greg moved these three pots from the atrium to the garden beside the carport as their roots
were causing a few issues.
No comments:
Post a Comment